HOW LONG DOES IT TAKE TO DEVELOP A WEBSITE
If you think that it’s possible to create a website in a couple of days – you are wrong. Development takes a lot of time, as it depends on many factors. Here are the main ones:
The complexity of the project.
You can make a one-page website that will sell one product, or a complex online store with thousands of items and powerful functionality. In this case, you should spend time working on a concept, design, and creating a corporate identity. The more complex the project, the more time will be required for its implementation.
Stages of development.
The development phase includes design, creation of UX/UI design, programming, layout. Each step takes from 7 days to 2-3 months.
Making decisions.
Approval is an important step when working with a customer. Each stage is separately approved. Approval takes 2-3 days.
Number of edits.
After making decisions, changes follow. It also takes time to make edits.
Filling.
Often, customers are engaged in filling content, but some pages are needed to be filled at the stage of site development. If the customer provides the content, the designer is engaged in its design. Or the content is prepared by a copywriter, and after approval it is executed.
When discussing the project, we estimate how much time it will take to develop the site. But it is worth considering the force majeure situations.
How long does it take to develop a corporate website?
Each project requires a specific preparation time. You can’t say the exact time frame for creating a branded website without knowing its goals and objectives. Therefore, we will analyze each stage and show how much, on average, a corporate website for a company is done.
HOW TO CHOOSE A RELIABLE COMPANY FOR CREATING A SITE?
Read More
DesignDesign includes the study of the structure of future pages, the concept of the main page, the main message. During the design, all the little things are thought out. This is a long process requiring analysis, study of the target audience, competitors. Based on analytical data, the UX designer develops a prototype. At the design stage, depending on the complexity of the task, it takes from 10 to 30 days. In some cases, more time is needed. Design developmentAfter the approval of the project, the UI designer proceeds with the development of layouts. He takes the project and begins to “paint” it, translate it into reality. Each page is approved separately by the customer. Better to make edits in the early stages than to redo everything later. UI-design development also depends on complexity, and takes from 20 days to 1.5 months.
Layout
As soon as the design is developed, the specialist proceeds with the layout. Again, the speed of the work depends on the complexity of the design. At this stage, the site “comes to life”, animations appear. Layout is also approved by the client, amendments are made. Everything usually takes about 30 days.
WEB DEVELOPMENT
Website development includes design development, page layout, programming, testing. When creating different types of sites, different tools and technologies are used.
Programming
Then one of the most difficult and critical stages begins – it is programming. Specialists create modules, blocks, applications, and other components of a branded website so that its functionality matches the project. There are several solutions: you can take ready-made modules and adapt them. But often, programmers use the Laravel framework for a corporate site.
The term of the work depends on the complexity of the tasks. A personal account is thought out, if necessary, an administrative panel is created for managing content. The corporate website programming stage takes 30-45 days, sometimes it can be a little longer. After development, the site is sent to the customer for approval. It will take time for the client to check everything, it takes about 7 days.
Project completion
When the technical work is completed, the project prepares for delivery. The corporate site is tested, checked for errors. The project manager provides training for the company on the use of the site, we will help to understand the management, promotion strategies, and other features of the site.
It may take up to 7 days to complete the project. As a result, the average development period is 4.5 months. It is worth considering several factors that can postpone this period: amendments, approvals, additional tasks, etc.